Cairn Energy Plc said on March 15 that it added 20% to its resource estimate for its oil field off the coast of Senegal.

Cairn Energy said its 2C resource estimate, or its best estimate of contingent resources, at the SNE Field had increased to 385 million barrels of oil after positive drilling results.