Manufacturing and engineering firms see the first green shoots of activity improvement as the industry retools for the future. 

The TAM FastSwell technology utilizes a proprietary process that alters the geometric design of the elastomer to provide ultra-fast, but predictable and controlled swell rates for challenging downhole conditions.

Problematic areas have included perforation issues, loss of fracture length, and sometimes wellbore connectivity.

Australia’s challenges include a shortage of support services, vendors, and good proppant sand.

Pages