The Trump administration on Sept. 27 eased safety rules on offshore oil and gas production put in place after the 2010 BP Plc (NYSE: BP) Deepwater Horizon disaster, as part of its effort to slash regulations and boost the energy industry.
The Interior Department revised the 2016 oil and gas production safety systems rule, part of a series of regulations the Obama administration enacted on offshore drilling and production after the drilling well disaster.
The final rule will appear in the federal register as soon as Sept. 28, according to a document seen by Reuters.
It eliminates or changes some safety standards for when a well is producing oil or gas, such as requiring that independent third parties certify devices. Other changes involve when operators have to notify the government about beginning oil and gas production and what they have to report about equipment failures.
The Interior Department said in the rule that "certain provisions in that [2016] rulemaking created potentially unduly burdensome requirements for oil and natural gas production operators on the Outer Continental Shelf, without meaningfully increasing safety of the workers or protection of the environment."
The rule supports the administration's "objective of facilitating energy dominance" it said.
The move was praised by industry but decried by environmentalists.
"We have a rule that is not a safety rollback, but instead incorporates modern technological advances," Randall Luthi, president of the National Ocean Industries Association, said Sept. 27.
Athan Manuel, director of lands protection at the Sierra Club, said the revisions were an "example of this administration’s shameless attempts to please corporate polluters, no matter the cost to workers’ safety, our health, or the environment."
Recommended Reading
Report: Crescent Midstream Exploring $1.3B Sale
2024-04-23 - Sources say another company is considering $1.3B acquisition for Crescent Midstream’s facilities and pipelines focused on Louisiana and the Gulf of Mexico.
For Sale? Trans Mountain Pipeline Tentatively on the Market
2024-04-22 - Politics and tariffs may delay ownership transfer of the Trans Mountain Pipeline, which the Canadian government spent CA$34 billion to build.
Energy Transfer Announces Cash Distribution on Series I Units
2024-04-22 - Energy Transfer’s distribution will be payable May 15 to Series I unitholders of record by May 1.
Balticconnector Gas Pipeline Back in Operation After Damage
2024-04-22 - The Balticconnector subsea gas link between Estonia and Finland was severely damaged in October, hurting energy security and raising alarm bells in the wider region.
Wayangankar: Golden Era for US Natural Gas Storage – Version 2.0
2024-04-19 - While the current resurgence in gas storage is reminiscent of the 2000s —an era that saw ~400 Bcf of storage capacity additions — the market drivers providing the tailwinds today are drastically different from that cycle.