BP-owned renewable natural gas (RNG) producer Archaea Energy started up its new Archaea modular design RNG plant in Shawnee, Kansas, located next to a privately-owned landfill, the company announced April 30 in a press release.
The Shawnee plant will use its modular design to capture gas from the nearby landfill and convert it to renewable natural gas.
The plant is capable of processing 9,600 standard cubic feet per minute (scf/min) of landfill gas into RNG—three times the size of Archaea’s Indiana plant. The RNG produced will be capable of heating up to 38,000 homes annually, the press release said, citing the U.S. Environmental Protection Agency Landfill Gas Energy Benefits Calculator.
The plant’s Archaea modular design allowed the plant to be built faster with skids and interchangeable parts than custom RNG plants. With the modular design, plants can be built for three different capacities—3,200 scf/min, 6,400 scf/min and 9,600 scf/min.
After purchasing Archaea Energy in 2022, BP became the largest RNG producer in the U.S. The integrated energy company’s global biogas volumes went up by 80% year-over-year in 2023, according to the company’s press release.
Recommended Reading
Forum Energy Signs MOU to Develop Electric ROV Thrusters
2024-03-13 - The electric thrusters for ROV systems will undergo extensive tests by Forum Energy Technologies and SAFEEN Survey & Subsea Services.
Axis Energy Deploys Fully Electric Well Service Rig
2024-03-13 - Axis Energy Services’ EPIC RIG has the ability to run on grid power for reduced emissions and increased fuel flexibility.
TotalEnergies Rolling Out Copilot for Microsoft 365
2024-02-27 - TotalEnergies’ rollout is part of the company’s digital transformation and is intended to help employees solve problems more efficiently.
PGS Wins 3D Contract Offshore South Atlantic Margin
2024-04-08 - PGS said a Ramform Titan-class vessel is scheduled to commence mobilization in June.
TGS Commences Multiclient 3D Seismic Project Offshore Malaysia
2024-04-03 - TGS said the Ramform Sovereign survey vessel was dispatched to the Penyu Basin in March.