From shallow and deepwater blocks on offer offshore Bangladesh to new production, below is a compilation of the latest headlines in the E&P space.
Activity headlines
Bangladesh Launches Offshore Bid Round
Two dozen blocks offshore Bangladesh are up for grabs in a new bid round, Bangladesh Oil, Gas and Mineral Corp. (PetroBangla) announced in early March.
In the Offshore Bidding Round 2024, nine shallow water blocks (SS-01, 02, 03, 05, 06, 07, 08, 10 & 11) and 15 deepwater blocks (DS-08, 09, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21 & 22) are up for exploration by the international oil companies.
Bids are due on Sept. 9.
Promotional and data packages are available for purchase from PetroBangla. Multi-client data can be purchased directly from the TGS-SLB joint venture.
In partnership with SLB and PetroBangla, TGS said on March 11 it acquired a 2D multi-client seismic data survey with widespread coverage offshore Bangladesh, encompassing over 75,000 sq km across all 24 blocks on offer in the bid round. The acquisition of this 12,636-line km 2D seismic survey was completed in April 2023. The final PSTM-processed products are available, and the final PSDM products will be available in May 2024.
New Hibiscus South Well Online
BW Energy announced March 8 it started production from the DHBSM-1H well in the Hibiscus South field on the Dussafu License offshore Gabon, five months after the November 2023 discovery.
Production performance from the well has been in line with expectations and stable at 5,000 bbl/d to 6,000 bbl/d.
The DHBSM-1H well was drilled as a horizontal well from the BW MaBoMo production facility to a 5,960 m total depth into Gamba sandstone reservoir. The well is about 5 km southwest of MaBoMo in a separate accumulation with a deeper oil-water contact than the nearby Hibiscus Field.
The DHBSM-1H well is expected to recover 6.6 MMbbl from approximately 22 MMbbl oil in place, based on third party 2P probable reserve estimates, BW said.
Contracts and company news
Aramco Renews Worley Contract
Worley said March 11 Aramco has renewed a general engineering services plus contract.
The additional five-year deal includes up to three one-year additional potential extensions.
Worley’s scope includes the project management and engineering services to support Aramco’s capital programs in Saudi Arabia across onshore, green and brownfield projects in gas, oil and new energy infrastructure.
FSO Design Receives Approval in Principle
ABS said March 5 it delivered an approval in principle to OceanSTAR Marine & Offshore Investment Pte. Ltd. for its new build floating storage and offloading (FSO) design.
The OceanSTAR FSO-01 has a shipshape hull design developed to cater to midsize FSOs with a storage capacity to scale up to 750,000 bbl of oil for operational demands in Asia Pacific and African coastal offshore fields. Other features include a larger strengthened deck area, expandable living quarters and piping routings that can adapt to topsides for either FPSO or floating production unit applications.
STRYDE Nodes Ordered in Ukraine, Poland
STRYDE has received new contracts, the company reported March 5.
First-time client Ukrainian seismic acquisition firm Georozvidka LLC purchased 25,000 STRYDE Nodes for use on 2D and 3D seismic surveys in Ukraine.
STRYDE is also supplying 12,000 additional nodes to Polish geophysical survey company Geopartner Geofizyka to boost its current node inventory and support a new upcoming seismic survey in the outskirts of Krakow.
Recommended Reading
Venture Global Seeks FERC Actions on LNG Projects with Sense of Urgency
2024-02-21 - Venture Global files requests with the Federal Energy Regulatory Commission for Calcasieu Pass 1 and 2 before a potential vacancy on the commission brings approvals to a standstill.
Despite LNG Permitting Risks, Cheniere Expansions Continue
2024-02-28 - U.S.-based Cheniere Energy expects the U.S. market, which exported 86 million tonnes per annum (mtpa) of LNG in 2023, will be the first to surpass the 200 mtpa mark—even taking into account a recent pause on approvals related to new U.S. LNG projects.
The Problem with the Pause: US LNG Trade Gets Political
2024-02-13 - Industry leaders worry that the DOE’s suspension of approvals for LNG projects will persuade global customers to seek other suppliers, wreaking havoc on energy security.
Belcher: Election Year LNG ‘Pause’ Will Have Huge Negative Impacts
2024-03-01 - The Biden administration’s decision to pause permitting of LNG projects has damaged the U.S.’ reputation in ways impossible to calculate.
Venture Global Gets FERC Nod to Process Gas for LNG
2024-04-23 - Venture Global’s massive export terminal will change natural gas flows across the Gulf of Mexico but its Plaquemines LNG export terminal may still be years away from delivering LNG to long-term customers.