Titan Torque Services has developed a new piece of drilling installation equipment designed to enhance operational safety and performance using a technology-led approach to pre-make and install liner and casing hanger running tools.
The company says its Push Pull Unit has been specially designed to put the running tool in place in a process that is more controlled and measurable than existing industry techniques.
The hydraulically controlled 75-ft (23-m) unit can carry an assembly of up to 20 tons. It has a pull capability of 12 tons and push capability of 15 tons. The unit also can install liner/casing from 4.5 to 36 in. and digitally measures and records the forces deployed.
www.titantorque.co.uk ?
Recommended Reading
US Raises Crude Production Growth Forecast for 2024
2024-03-12 - U.S. crude oil production will rise by 260,000 bbl/d to 13.19 MMbbl/d this year, the EIA said in its Short-Term Energy Outlook.
US Drillers Cut Oil, Gas Rigs for Fourth Week in a Row-Baker Hughes
2024-04-12 - The oil and gas rig count, an early indicator of future output, fell by three to 617 in the week to April 12, the lowest since November.
Third Suriname Find for Petronas, Exxon Could Support 100,000 bbl/d FPSO
2024-05-17 - A recent find offshore Suriname in Block 52 by Petronas and Exxon Mobil could support a 100,000 bbl/d FPSO development, according to Wood Mackenzie.
US Drillers Add Oil, Gas Rigs for First Time in Four Weeks: Baker Hughes
2024-05-17 - The oil and gas rig count rose by one to 604 in the week to May 17.
US Gas Rig Count Falls to Lowest Since January 2022
2024-03-22 - The combined oil and gas rig count, an early indicator of future output, fell by five to 624 in the week to March 22.